index
:
ruby.git
master
ruby_1_3
ruby_1_4
ruby_1_6
ruby_1_8
ruby_1_8_5
ruby_1_8_6
ruby_1_8_7
ruby_1_9_1
ruby_1_9_2
ruby_1_9_3
ruby_2_0_0
ruby_2_1
ruby_2_2
ruby_2_3
ruby_2_4
ruby_2_5
ruby_2_6
ruby_2_7
ruby_3_0
ruby_3_1
ruby_3_2
ruby_3_3
v1_0r
v1_1dev
v1_1r
The Ruby Programming Language
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
object.c
Age
Commit message (
Expand
)
Author
2001-12-18
* eval.c (rb_thread_schedule): should not select a thread which is
matz
2001-12-04
* io.c (io_fread): EAGAIN/EWOULDBLOCK should not terminate and
matz
2001-10-02
* ext/socket/socket.c (unix_addr): getsockname(2) may result len = 0.
matz
2001-08-11
* object.c (rb_obj_inspect): merge from 1.7: remove useless space.
nobu
2001-07-27
* eval.c (rb_eval): add CHECK_INTS before next, redo, retry to
matz
2001-07-13
* eval.c: wrapper modifies updated to 1.7 changes.
matz
2001-06-01
* file.c (rb_file_s_unlink): should not allow if $SAFE >= 2.
matz
2001-04-24
* ruby.c (set_arg0): wrong predicate when new $0 value is bigger
matz
2001-04-06
* variable.c (rb_const_get): no recursion to show full class path
matz
2001-03-28
* object.c (rb_str2cstr): warn if string contains \0 and length
matz
2001-01-23
* gc.c (rb_gc_call_finalizer_at_exit): should finalize objects in
matz
2001-01-15
typo
eban
2001-01-15
Sun Jan 14 21:49:28 2001 Koji Arai <JCA02266@nifty.ne.jp>
matz
2001-01-10
* gc.c: wrap inline by #if.
matz
2001-01-09
* string.c (rb_str_reverse_bang): forgot to call rb_str_modify().
matz
2000-12-25
001225
matz
2000-12-08
matz
matz
2000-11-14
matz
matz
2000-11-13
matz
matz
2000-10-16
matz
matz
2000-10-13
matz
matz
2000-10-10
matz
matz
2000-10-05
matz
matz
2000-09-26
matz
matz
2000-09-15
matz
matz
2000-09-12
matz: 1.6.0 final (hopufully)
matz
2000-08-31
matz
matz
2000-08-09
matz
matz
2000-07-17
matz
matz
2000-07-15
matz
matz
2000-07-06
matz
matz
2000-06-29
matz
matz
2000-06-22
2000-06-22
matz
2000-05-25
2000-05-25
matz
2000-05-24
2000-05-24
matz
2000-05-09
2000-05-09
matz
2000-05-01
2000-05-01
matz
2000-04-10
2000-04-10
matz
2000-03-23
2000-03-23
matz
2000-03-09
2000-03-09
matz
2000-03-08
2000-03-08
matz
2000-03-07
2000-03-07
matz
2000-02-29
2000-02-29
matz
2000-02-23
2000-02-23
matz
2000-02-01
2000-02-01
matz
2000-01-18
2000-01-18
matz
2000-01-05
20000105
matz
1999-12-14
19991214
matz
1999-12-06
19991206
matz
1999-11-17
19991117
matz
[next]